For many large organisations, the period of peak energy demand over the winter season (typically 4pm to 7pm), can be draining, both in terms of consumption and costs.

One such location with particularly high electricity network charges was BAE’s Filton 20 site, based on the outskirts of Bristol. BAE knew that something had to be done, and when approached by npower Business Solutions, Energy HQ (nBS, EHQ), they agreed on a partnership to combat their consumption, carbon emissions and overall energy costs through the use of Demand Side Response (DSR) services.

Download our full BAE Systems case study here